Thanks to the innovative Outer-Sanctum mini piling system and our unique lightweight, factory finished, fully insulated base and wall system, next generation installation has come of age.
Wet trades, concrete, spoil and skips are totally eliminated and the traditional process of laying foundations which takes up to three weeks, is cut down to three days. In fact, in many instances the base and walls can be installed within one day even if it's raining.
OUTER SANCTUM MINI ANCHOR SOLUTION

Outer-Sanctum Mini Anchor System gives the
range a unique position in the market
EASY TO INSTALL
The mini anchor system is designed to make life easier for the installer and customer alike:
- All components can be carried by hand
- No need for concrete and associated materials and equipment
- Piles are installed with great precision
- The pile capacity is continuously monitored
- Buried services once located can be avoided
- Deep piles avoid problems of heave from trees
- We create deep pile foundations in minutes
- The 110 Volt electric anchor driver is clean, quiet and vibration free
Once the anchors have been installed, the adjustable bracket is fitted to give a precision foundation for the base.

